Do you know the details of temperature control in asphalt construction?
The asphalt mixture leaves the plant at a controlled temperature of 180°C; the site temperature for pre-mixed material is 165°C, and the paving temperature must not be below 160°C. In addition, the paver’s receiving hopper should be coated with a thin release agent or anti-sticking agent, and the asphalt must be preheated 30 minutes before work starts, to no less than 100°C.
The paving speed also matters: it should be kept at 2–6 meters per minute, with slow, uniform, continuous paving — no arbitrary speed changes or stops midway. Our professional staff check the paving temperature at any time during construction. That is how we guarantee the quality of our asphalt work.