Road asphalt construction is a complex project completed through multiple procedures. This article explains the specific steps and precautions.
1. Preparation
Before construction: determine the site and scope; arrange personnel and machinery; survey and measure the site to determine road height and gradient; clean the site so the road surface is clean and flat.
2. Construction Steps
Base course: lay the base material (crushed stone, sand-gravel, etc.), generally 20–30 cm thick, to ensure stability and load-bearing capacity.
Cement mortar layer: lay a layer of cement mortar 5–10 cm thick over the base to further strengthen stability and bearing capacity.
Asphalt mixture layer: pave the asphalt mixture — a blend of asphalt, crushed stone, sand and additives — generally 5–8 cm thick.
Compaction: compact the mixture with vibratory or steel-wheel rollers. Compaction makes the mixture denser and improves surface flatness and stability.
Surface seal coat: apply a seal coat (asphalt or emulsified asphalt seal) to prevent water penetration and extend road life.
3. Precautions
Ensure the safety of personnel and machinery; survey and measure before construction to confirm height and gradient; protect the environment during construction; adjust the mix ratio to actual conditions to guarantee quality; and cure the road after completion to maintain flatness and stability.
In short, road asphalt construction involves multiple procedures; safety, environmental protection and quality must all be managed to ensure the road’s service life and safety.